It rests on the end of the quarry board with a single 2x2 leg and one of my standard trestles
The track plan was in my head but has now been transferred to the real world by laying out the track on the board and I'm pleased to say that it will nearly all fit as I hoped. The only facility I've had to scrap is a bay platform as the board isn't wide enough. I have all the track in hand except two pairs of left hand points. I also have all the electrics available; this board will have it's own controller so that a second operator could control the station if one was available. It also opens up the possibility of using Underhill Town on it's own with just a fiddle yard attached.
The left hand end
The right hand end
No comments:
Post a Comment