On closer inspection, I found that in rushing to lay the track I had not laid it very well and had messed with the geometry ending up with some very bad joins and kinks in the curves. So after a bit of a re-jig I ended up with a very nice little circuit on which short wheel based locos and rolling stock will enjoy a trip out.
I'm also building a Christmas scene layout for the temporary Dinas station in the goods shed which will be the WHR terminus for Santa trains and the over Christmas service.
It is just a circuit of KATO n gauge track with a castle in the middle. It will be all snowy and covered in Christmas clichés. The train will be button operated so that whatever loco ends up on it doesn't get too worn out, it's a bit of fun for the kids to press the button too. Most of the basic scenery is done now with just snow effects to add. I also have to do the wiring but that won't be too hard.
My new Kerr Stuart is now named Sphinx and is finished all but the works plates which are on order. It looks great and spent a happy while trundling round the new layout yesterday evening. I might glaze the cab windows but otherwise, done. Very nice kit from Neil Rushby, highly recommended.
No comments:
Post a Comment