Wednesday, 17 September 2014

Water and plaster

I've continued with the scenery work this week to the point where I ran out of plaster bandage and filler. Panic not, both are replenished. I've moved on down the valley towards 'the horseshoe' end and I'm pretty happy with the results, so far.



I've used some leftover plastic rock here and there. The plaster bandage forms the basic landscape over the polystyrene and bits of old stuff, then once it's set I layer some filler over it and then smooth it out with a very wet brush. It takes a while to set hard and is prone to crack a bit. If it does I just fill the cracks with another layer of filler. I try to make the landscape as though the rock and earth has been eroded by nature, principally water. 

Tryfan Junction Station from the footplate of Lyd

I've had a very busy weekend in the 'real' world so haven't had much chance to progress, however I have built and painted a water tower for the station. 



The basis of the water tower is a Unit Models resin casting but it isn't tall enough as nature intended so I've added an extra layer to add height. This is originally a Talyllyn job with a wooden trough to fill the loco but that is no good for me so I've made a pipe with a valve and a more traditional fabric 'bag'.



It ends up on the wrong side of the loop so I will need to add a facility on the 'up' line. It will need a pump to get the water to it which is an excuse for some sort of waterwheel and pump arrangement.






Thursday, 11 September 2014

Getting plastered again

I finally had a day off and found a few hours to make some progress on the layout. As I left it last week I'd glued rocks and some wall mouldings in place.

Lady Stoner with a maximum train of five

In the afternoon I roughly filled the cracks between the plastic rocks and covered over where the scenery was just lumps of expanded polystyrene. I tried to make it as close to how I envisaged the finished thing but only using a small trowel it was quite rough and had lots of trowel markings in it.


Rough plastering done

A PQR over-bridge

It being my daughters birthday this weekend I went into Bangor to do some secret shopping and to comfort myself for the pain this would entail I went a pretty way which just happened to go near the trackbed of the Penrhyn Quarry Railway. Having been that way before I knew there was a rather nice over-bridge which was crying out to be photographed and then later, modelled. It is a bit overgrown but I took a picture anyway, I'll come back in the winter when the undergrowth is sparser.


After dinner I sneaked off out to the garage again and took some water with me; firstly I used a brush and liberal quantities of the water to smooth and shape the afternoons plaster into more pleasing and natural shapes. Once I'd done that I couldn't resist getting out a roll of plaster bandage and moving on down the layout with some basic land forming.


I also started the bandage work on the viewers side of the track too. I'm very pleased with how the feel of the station is coming along. A bit Tan y Bwlch but not too much.

The bottom end with the station building in place



These last two pics show where I'd got up to at close of play. You can also see the ground frame hut which I rescued from the shop window diorama at work. It was a Bachmann Scenecraft green house but after a repaint and the addition of a bell and a walkway over where the rodding comes out I think it look the part.

I can't wait to get back in there and get some more done but With the Superpower gala and my daughter's birthday all coinciding it might be a while till I get a chance.







Monday, 1 September 2014

Rock and Roll

Spent a couple of happy hours with the hot glue gun and some fake rock yesterday.I also made some progress with where the new overbridge will go and also with the rock face which sits behind Blackhill Station.  It all needs some filler and of course some paint to finish it but the general look is better.

The overall view - the trains are actually diverging

The new bridge in place

I decided that there isn't really room for a house so the bridge leads to a footpath which rises up over the railway and then up a flight of steps, not sure where it goes after that, probably behind a bush.


 In modifying the rockface I've made slightly more room for the station building but clearances are definitely tight. I still need to sort out a water tower for the top end and a lever frame. I made a nice little lever frame box but put it on the display module in the shop window at work... I may have to nick it back... replace it with a bush probably.




While I was working on the layout I gave the stairs a good coat of grey primer so I could paint them later. I had originally thought of painting them Stoner stone colours, i.e. browns and so on but seeing it grey it just shouted to be painted like an FR one; so thats what I did. I'm pretty pleased with the results, it needs some weathering but I'll do that when I finally plant it on the layout.


Saturday, 30 August 2014

Stairway to... well a wall

I added some handrails and a bit more height to the actual bridge bit so that the little plastic people don't fall onto the track. I've also taken the completed model out to the garage and sited it where it will end up.



At the moment the scenery blocks the location but with some modification it will be fine. The square block in front of the track will be much lower and there will be somewhere for the stairs to lead to at the back. I might even get carried away and make some low relief house backs in the style of Tanygrisiau. Before I do that I have 6.5m3 of logs to move round the house and stack which had been delivered when I got home yesterday... I guess they will still be there when I get home tonight too.




Wednesday, 27 August 2014

Bridge over troubled styrene

Gave the new loco a final coat of hull red and touched up the other colours where I'd messed up. Looks the part now.


When you're building a loco you get the urge to build a bridge, well, I do. So I decided to start work on a foot over bridge which will work as a scenic break at the top of the big hill.

This is the steps on their own

It is vaguely based on the footbridges on the upper section of the FR. It has to be rather taller than the FR ones as it has to clear the Egger blue coach with the brake cabin.

 
This was the state of play at bed time. The steps are made from Evergreen strip chopped up with scissors. Using scissors gives the cut edge a rough edge not unlike the rough slate blocks of the prototype. I then made a solid shape with sheet styrene which I then covered with a laminate of Slater's stone sheet. The edging stones were cut from thicker styrene sheet and glued onto the top edges. The bridge bit is made from more Evergreen sheet with detail from strip.

I'll add handrails from brass rod, hopefully tonight...




Monday, 25 August 2014

Straightish and redish

Been busy at work and at home so hadn't made much progress with Beckfoot but I have finally had the chance to get the body straight on the chassis. I still can't find a way to secure the two part together but it is now a reasonable interference fit so it will have to do.


I've also started painting it, I gave it another waft of primer to even out where I had added and changed bits and then I've given it one coat of Hull Red the standard IoSR loco livery. Another coat should even things out and then a bit of a tidy up of the other colours and it can enter service.



Name plates are on order from the ever fabulous Narrow Planet and a couple of bits and bobs like oil cans, dirt and crew will see a finished job. It will end up weathered as a pre preservation, working loco and I suspect will see plenty of service as it seems to have plenty of pulling power.



Wednesday, 20 August 2014

Slight progress

With not much time available I've made a few additions and adjustments to Beckfoot.





 
It needs cab rear hand rails but I don't have enough knobs in hand at the moment and where they need to go is rather fragile so I will have to file them flat and glue them on which is not ideal. Apart from that and securing the body to the chassis its pretty much finished... except for paint, obviously.